Назад к новостям
Комментарии
8
fraserharris
20.07.26 16:13This article is somewhat out-of-date. The L & 7 trains were modernized to communications-based train control (CBTC) & automatic train operation (ATO) since 2006 & 2018 respectively. This allows for moving-block signaling, where a trains are separated by a distance, instead of fixed blocks of track. The legacy fixed-block signaling system is still retained as a fallback.
dan_sbl
20.07.26 16:22Very similar detailed site for the Chicago L. Here's the signals page, but a ton more to explore as well: https://www.chicago-l.org/operations/signals/signals.html
lanyard-textile
20.07.26 16:52That logo though :) Tickled that the "Y" and only the "Y" reference NYC.
zelias
20.07.26 18:15Lots of words for "chain in, rail out" as they say on Nauvis
Varelion
20.07.26 16:09A very interesting thing to read on a long NYC metro ride.
20.07.26 20:24